Cliffhanger

Month

June 2013

1 post

Jun 18, 2013
#concrete #construction #econ group #retaining wall

April 2013

2 posts

Apr 23, 2013
#deck #cedar #econ group #construction
Apr 3, 2013

March 2013

1 post

Mar 24, 2013

February 2013

3 posts

Feb 25, 2013
Feb 14, 2013
#econ group #Resysta #siding #Cliffhanger
Feb 6, 2013
#econ group #construction #skylight #siding #stairs

January 2013

2 posts

Jan 26, 2013
Jan 23, 2013
#stairs #construction #econ group #Cliffhanger

November 2012

5 posts

Change orders: understanding budget-creep

Few of us are wholly at home with the unknown, even fewer with the financial unknown. When we embark on our single largest lifetime investment (building a home), the idea of not really knowing how much we’ll actually spend does not sound at all appealing. The homeowner and all of her financing vehicles rely on the expertise of her builder (and, often, their associated Quantity Surveyor) to generate a thorough and accurate budget at the outset of the project.

Does a project budget equal a fixed price?

In production homebuilding (i.e., subdivisions of endless cookie-cutter houses on level lots) building at a fixed price is possible, but the entire concept of building a custom home is based on unknowns. Each custom home is a one-off prototype never again to be produced, whose level of complexity cannot be appreciated or anticipated by fixed pricing. There are changes of heart, unforeseen site conditions, and myriad other real-world impacts that cause anticipated costs and timelines inevitably to shift. This is why custom homebuilding must rely on change orders and healthy, well-considered contingency funds to prepare for the unknowns.

Client/architect change orders

On the Cliffhanger House, the project’s talented designer, Kevin Vallely, had called for the use of custom, kiln-dried, clear cedar siding. However, after the initial round of budgeting, he and the homeowners opted for a more finance-friendly Hardie lap siding.

As the project began to take shape, it became clear aesthetically, that Hardie would not suffice and that the siding matter must be revisited. After much consideration, a mock-up of a third siding system (called Resysta) was done for the client. The fibre reinforced hybrid material is produced of 60% rice husks, 22% common salt and 18% mineral oil and makes for a low-maintenance, waterfront friendly siding.

It also costs more in terms of materials, and more in terms of labour to install. In fact, it more than doubled the budget line-item. And so was born a change order.

Site-driven/engineer change orders

After months of blasting and excavation on the granite-heavy Cliffhanger site, the engineer determined the structural need to reinforce the foundation through the construction of additional buttress walls which would tie the foundation to the rock faces at the edges of the excavation and retain backfill. This change order impacted costs not only though additional material and labour needs, but also through the resulting impact on job-site access.

Contributor: Dalit Holzman, Econ Group Ltd.

Nov 26, 2012
#change order #contingency #contractor #engineering #architect #Kevin Vallely #econ group #siding #resysta
Nov 25, 2012
Nov 18, 2012
Nov 7, 2012
Nov 2, 2012

October 2012

3 posts

Oct 12, 2012
Oct 11, 2012
#econ group #construction #contractor #Cliffhanger
Oct 5, 2012

September 2012

2 posts

Sep 8, 2012
#econ group #construction #forming #backfilling #Cliffhanger
Sep 6, 2012

August 2012

5 posts

Aug 23, 2012
#joists #construction #econ group #Cliffhanger #northshore
Aug 20, 2012
#Cliffhanger #eagle west #Crane #econ group #construction
Play
1:22
Aug 7, 2012
#crane #eagle west #Cliffhanger #construction #econ group #building
Aug 3, 2012
Aug 2, 2012
#building #forming #rebar #concrete #econ group #construction #northshore #Cliffhanger

July 2012

8 posts

Jul 31, 2012
#rebar #forming #on site #construction #econ group #building #Cliffhanger #northshore
Jul 31, 2012
Jul 25, 2012
Jul 17, 2012
#econ group #shotcrete #concrete footings #construction #Cliffhanger
Play
0:14
Jul 17, 2012
#econ group #concrete footings #shotcrete #Cliffhanger
Play
0:25
Jul 16, 2012
#econ group #Cliffhanger #blasting
Jul 16, 2012
#econ group #drain tile #Cliffhanger
Jul 16, 2012
#econ group #Cliffhanger #concrete footings

June 2012

12 posts

Jun 25, 2012
#econ group #excavation #blasting #metro blasting #Cliffhanger #northshore
Jun 19, 2012
#econ group #demolition #excavation #blasting #metro blasting #Cliffhanger #northshore
Jun 17, 2012
Jun 17, 2012
Jun 17, 2012
Jun 13, 2012
#mike dutson #metro blasting #headwater management #econ group #excavation #blasting #Cliffhanger
Jun 9, 2012
Jun 9, 2012
Jun 7, 2012
Jun 7, 2012
Jun 4, 2012
#Cliffhanger #House #mike dutson #excavation #headwater management
Jun 2, 2012
Published I North Shore News

Making models part of the job

Kevin Vallely   I   Project Designer

May 31, 2012

May 2012

25 posts

May 30, 2012
#excavation #blasting #econ group #Cliffhanger #headwater management #mike dutson
May 30, 2012
Play
0:26
May 24, 2012
May 23, 2012
#econ group #Cliffhanger #northshore #house #mike dutson #headwater management #blasting #metro blasting
May 23, 2012
Next page →
2012 2013
  • January 2
  • February 3
  • March 1
  • April 2
  • May
  • June 1
  • July
  • August
  • September
  • October
  • November
  • December
2011 2012 2013
  • January 2
  • February
  • March
  • April
  • May 25
  • June 12
  • July 8
  • August 5
  • September 2
  • October 3
  • November 5
  • December
2010 2011 2012
  • January 3
  • February 6
  • March 3
  • April
  • May 1
  • June
  • July 2
  • August
  • September 4
  • October 1
  • November 1
  • December 1
2010 2011
  • January
  • February
  • March
  • April
  • May
  • June
  • July
  • August
  • September
  • October
  • November
  • December 1